Sidebar Sidebar Sidebar
sale
  • Guaranteed Fitment

    Always the correct part

  • In-House Experts

    We know our products

  • Added Value

    FREE in house engineering and design assistance

  • Wordwide Delivery

    Free shipping on all Harrington orders over 500LBS

8-Bar Transfer Cap, Left Hand, 40A to 350A Bar, Red Lexan Conductix XA-14118

Write a Review
$20.90
$20.90
$17.77
(You save $3.13 )
SKU: XA-14118
Weight: 0.02 LBS
Shipping: Calculated at Checkout
Adding to cart… The item has been added
8-Bar Transfer Cap, Left Hand, 40A to 350A Bar, Red Lexan Conductix XA-14118

8-Bar Transfer Cap, Left Hand, 40A to 350A Bar, Red Lexan Conductix XA-14118

$20.90
$20.90
$17.77
(You save $3.13 )
The XA-14118 8-Bar Left-Hand Transfer Cap is engineered to facilitate smooth lateral transitions of collector shoes between conductor bars in 8-Bar systems ranging from 40A to 350A. Molded from high-strength red Lexan, this transfer cap provides a non-conductive, impact-resistant path that helps maintain reliable electrical contact and minimizes wear on moving components. The left-hand orientation is specifically designed for systems where the collector travels in a defined direction requiring guided entry from the left side of the bar. Key Features: Left-Hand Orientation: Designed for guiding collectors onto the conductor bar from the left-hand side. Wide Amperage Compatibility: Fits 40A, 90A, 110A, 250A, and 350A 8-Bar conductor systems. Red Lexan Construction: Durable, non-conductive, and medium heat-resistant for safe indoor or covered applications. Smooth Transition Path: Reduces collector shoe wear and ensures continuous power pickup during movement across joints. Precision Fit: Maintains bar alignment and improves system reliability at transition points. Technical Specifications: Material: Red Lexan (polycarbonate, medium heat resistant) Orientation: Left-hand Bar Compatibility: 40A to 350A 8-Bar conductor bars Function: Lateral transfer guide for collector shoes Application: Indoor or protected conductor bar installations Installation: Mounts to the left-hand side of the conductor bar transition zone

Customers Also Viewed